The schedule for tomorrow is set and unfortunately, I won't be making the side trip to Stokesdale. The training seminar will end between 10:00am and noon. That would put me home between 6:00 and 8:00pm tomorrow night. I have to take advantage of the time at home to get the new place fixed up that Dew has been posting pics of. It's more than just cosmetic. The electric service entrance is substandard and will not pass inspection. The current cable is 4/0, 4/0, 2/0, 2. Current code requires 4/0, 4/0, 4/0, 2/0 for mobile homes. I have to dig up the old underground service and install new service, including a new 200A disconnect before we can get the power on. I have to get the power on to make the needed repairs.
On the bright side, I have heard rumors that I will be back in Raleigh, possibly in November, for another seminar. If so, I will plan accordingly and head down a day early (on a Saturday) and have all day to visit on Sunday. We should be in the new place by then and most of my irons should be out of the fire.