catjac1975 said:
Where are the latest pictures???Don't forget about us!
Oh I wont, I had to get a few other things completed. I did get to Lowes yesterday and I picked up more 12 foot 2x4's and OSB.
Im going to try to get the last (east) wall up either today or tomorrow then I will be starting on the roof.


Chris
 
Well I got some work done on the greenhouse done to day.
East wall (last wall)
7054_dsc_0326.jpg


Ridge Beam
7054_dsc_0327.jpg


Now there will be a 4x4 post that will go from the ground to the beam to help bear the load of the roof and limit sagging.

Chris
 
This is great to see, you've made a lot of progress. When you're done I sure could us one!!!! Hahahah
 
vfem said:
This is great to see, you've made a lot of progress. When you're done I sure could us one!!!! Hahahah
I'm happy to get some more work done on it. I cant wate to get it done and start playing in it. ;)


Chris
 
Well it looks like the only thing I getting done today is the center beam that helps hold up the ridge beam. (looks like rain and I need more lumber)

7054_dsc_0328.jpg


7054_dsc_0329.jpg


Chris
 
Collector said:
progress is looking great, looks like you are close to the finish line!
It's getting real close.
I have about 20 - 2x4's and 5 - 4x8 OSB to get and external framing will done. Then I'll have trim to put up and then put 2 good coats of a heave primer and a coat of paint on it.

Internal bells and whistles might take some time.
I have to build the benches, run pluming and electric then I want to insulate the north roof and all the walls.
I should have everything up and running by fall.

I also want to build a heated propagation bench with a auto watering/misting system.


Chris
 
chris09 said:
Collector said:
progress is looking great, looks like you are close to the finish line!
It's getting real close.
I have about 20 - 2x4's and 5 - 4x8 OSB to get and external framing will done. Then I'll have trim to put up and then put 2 good coats of a heave primer and a coat of paint on it.

Internal bells and whistles might take some time.
I have to build the benches, run pluming and electric then I want to insulate the north roof and all the walls.
I should have everything up and running by fall.

I also want to build a heated propagation bench with a auto watering/misting system.


Chris
sounds like you are going to have it all blinged up LOL.
 