- Thread starter
- #241
897tgigvib
Garden Master
- Joined
- Mar 21, 2012
- Messages
- 5,439
- Reaction score
- 929
- Points
- 337
Worked my scrawny buns off filling the south bed base today. 40 foot long, 3 feet wide, and between 12 inches and 2 feet deep for the base. Used soil from the back side beds for the base. Got 7 feet of the antigopher cage put together and into it.
Should be maybe able to finish the antigopher cage for it tomorrow. I want to get that bed planted soon as possible.
Then it'll be to the last bed in the main section.
After that, the back part will go slower as I have to get the soil from a ways off for the 2 beds there, plus do some framing.
Should be maybe able to finish the antigopher cage for it tomorrow. I want to get that bed planted soon as possible.
Then it'll be to the last bed in the main section.
After that, the back part will go slower as I have to get the soil from a ways off for the 2 beds there, plus do some framing.

so I'm going to try to use straw bales in an area of the greenhouse this winter to keep the ground from freezing. We'll see what happens.