Latest update:
Today was pretty productive. I hung the rest of the upper cabinets yesterday, and today I managed to get the new range hood installed and wired up. It was a bit of a bear because the stove and hood set about 15" left of where they used to set, so the hole in the ceiling didn't line up with the cabinet anymore. Plus, the new hood is a 7" duct while the existing duct is 5". I went to a local hardware store (M&M Hardware...got to give them props because they have everything, including great customer service!) and found everything I needed to reduce from 7" to 5" duct. It may restrict flow from the fan, so I'll try it on low first, we'll see. The alternative was cutting another hole in the roof, a project I totally dread in a metal roof mobile home.
Anyway, it's in. I still have one more upper to hang, but I won't put it up until the lowers are in. That way I can ensure that it is plumb with the lower cabinet, since it will be a free end. All of the doors are also now on the uppers.
After that, I removed the carpet from the last bad spot in the floor in the living room. It wasn't as bad as I thought, so after a few hours I completed the last of the major structural repairs...YAY!
The new tub arrived around 4:00 this afternoon, so I had to drive to town and meet the driver to pick it up. It's still sitting in the back of my van.
Tomorrow I'll fill any gaps in the kitchen floor, apply leveler where needed and hopefully start laying the wood laminate. Dew has given the walls a clean bill of health for painting, so she will be finishing that up. I still have enough materials left to replace the floor around the toilet in the master bath, so that is probably on the list too.
Dew and I also moved all of the lower cabinets into the wood shop for finishing. I doubt I'll get to it this weekend and will have to do them a little at a time after work in the evenings. Why do vacations have to go by so fast?