I got the other roll of wire clipped to the T-posts this morning. Then went inside to do more prep work. A couple of friends came over around 2 PM and he did the finish work on the taping and floating work. I knew what it should look like, but just couldn’t get it there. In 3 hours, it was done. Finished. It was like watching an artist in motion. He was fast, smooth, efficient and it was pure artwork. He worked with his uncles, starting at 8 years old, doing sheetrock.
We went to a Mexican restaurant in Groveton and I bought their supper. I got home at 7:30, fed sheep and dogs. Came inside and noticed it was hot. 85F and the brand new AC wasn’t running. Called AC guy, he would have come out immediately, but I told him come in the morning, 7AM. I can survive the night.
Hot, tired, filthy, coated in sheetrock dust from sanding the walls, I took a shower. I feel better, just hot. Having a glass of wine, soon I won’t care. LOL